The only sure way to tell when the wait is over is with a moisture meter.
Bamboo flooring moisture content.
Floors will expand or contract as rh levels rise or fall.
Amazon s choice for hardwood floor moisture meter.
If you don t acclimate wood flooring it can cause a myriad of problems.
Maintain consistent humidity levels throughout your home.
Bamboo flooring can be installed when the moisture content between the floor and subfloor is within 3.
Wait until bamboo flooring adjusts to room temperature and humidity.
For proper acclimation material must achieve room temperature 65 80 degrees f for 24 hours prior to installation.
There are two types of moisture meters for wood subfloors.
4 5 out of 5 stars 5 784.
General tools mmd4e digital moisture meter water leak detector moisture tester pin type backlit lcd display with audible and visual high medium low moisture content alerts grays.
For 3 and wider planks the floor moisture content should be within 2 of the moisture in the wood subfloor.
Installation should not start until these requirements are met.
The moisture of strip flooring 2 wide boards will have to be within 4 of the moisture in the subfloor.
Due to shrinkage of bamboo while being dried the moisture content has to be re adjusted.
Get it as soon as fri oct 2.
Any wood or bamboo flooring will expand or contract with varying rh levels.
Before it s installed all bamboo flooring needs a waiting period inside the house so that its moisture content can stabilize.
If the moisture content of wood flooring isn t right then it can warp buckle or even delaminate causing significant damage and ruining the aesthetic value of the flooring.
Skip that wait and your new floor can shift or show gaps.
Moisture meters can be used to check subfloors for water damage moisture content of wood subfloors prior to installing any flooring and if the hardwood is at the correct level for the subfloor.
Acclimate as long as possible and use a moisture meter to check moisture content of the flooring and sub floor.
The moisture level content of the wood and subfloor must be within 2 points of each other and the subfloor must not exceed 12.
Whether it s engineered hardwood bamboo or real wood it s crucial to acclimate wood floors before installation this process ensures that your wood reaches a moisture content level that s in sync with the surrounding environment.
Bamboo stains glues and finishes very well but is species dependent when it comes to the difficulty of working with it and its stability.
Moisture meters can be used by all flooring trades not just the hardwood installers.
To make sure that the moisture content of wood flooring is in the right range many professionals use flooring moisture meters to test their wood flooring materials and.